If there is one prayer that you should pray/sing every day and every hour, it is the
LORD's prayer (Our FATHER in Heaven prayer)
It is the most powerful prayer.
A pure heart, a clean mind, and a clear conscience is necessary for it.
- Samuel Dominic Chukwuemeka
For in GOD we live, and move, and have our being. - Acts 17:28
The Joy of a Teacher is the Success of his Students. - Samuel Dominic Chukwuemeka
Calculate the Current and Cumulative Grades for your Course using the Grading Method
Review the Grading Rubrics for your Course
Great Students,
I greet you this day,
Procrastination is inimical to time.
The fact that Mr. C does not deduct any penalty due to late homework assignments (besides Discussion Board assignments)
should not make you to procrastinate.
The method used to calculate your final grade is known as the Weighted Average Method
This implies that the different forms of assessments have different weights.
The course syllabus provides a detailed example of the calculation of your final grade.
More examples are also explained in
Questions $25$ and $27$ of this website
It is expected in all my courses that my students use the information provided in the course syllabus to calculate their
grades and ensure that each grade is correct and in accordance with the grades in the school's
LMS (Learning Management System) gradebook.
You may verify your calculations with the calculators provided for you in this website.
You may use the calculators to determine your current and cumulative grades anytime.
Hopefully, this will guide you in your decision towards a successful completion of the course.
Please do not request your grades by email or text message.
FERPA (Family Educational Rights and Privacy Act) law restricts me from sending any grade via
email or text message to you.
I did not make the law. I am just abiding by the law. I hope you understand.
Please use the school's LMS (Learning Management System) to see your grade.
You can confirm the grade you see in the LMS with your calculations, and with this calculator.
If there is any discrepancy or if there is anything you do not understand, please contact me via the school's system or
attend the Office Hours/Live Sessions.
For Online/Virtual/Hybrid Students:
(1.) The topic(s) to be covered each week are listed in the Tentative Class Calendar of the
course syllabus.
(2.) It is expected that you complete the topic(s) in the assignments once they are assigned for
the week.
(3.) Please calculate your current grade based on those weekly topics only.
(4.) The cumulative grade is based on all the topics (both covered and yet to cover).
(5.) Please review the Examples and the Rubrics provided at the bottom of each form.
Click on an example (a tab) to show it.
Click again to hide it.
It is highly recommended that you review each example one at a time.
Once you are done reviewing an example, please hide it prior to reviewing another example.
(6.) All the topics have already been assigned to you. You do not need to wait for me to cover
it before you begin to work on them.
You are welcome to work ahead.
For Traditional/Hybrid Students:
(1.) The topic(s) to be covered in each class session are listed in the Tentative Class Calendar
of the course syllabus.
(2.) It is expected that you complete the topic(s) in the assignments once they are covered.
(3.) Please calculate your current grade based on the topics that have been covered only.
(4.) The cumulative grade is based on all the topics (both covered and yet to cover).
(5.) Please review the Examples and the Rubrics provided at the bottom of each form.
Click on a tab to show it.
Click again to hide it.
It is highly recommended that you review each example one at a time.
Once you are done reviewing an example, please hide it prior to reviewing another example.
(6.) All the topics have already been assigned to you. You do not need to wait for me to cover
it before you begin to work on them.
You are welcome to work ahead.
Should you have any questions, please contact me via the school's system.
Thank you.
Please type only numbers (integers and decimals only).
The fields for DB 1 are required.
The other fields are not required.
The olive-colored textboxes are the only textboxes that will accept user input.
To Calculate: the current grade and the cumulative grade
Let us assume that you want to find out your current grade in Week $5$ (fifth week of the course).
According to the course syllabus:
In the beginning of Week $5$:
(1.) DB $1$ should have been completed.
(2.) DB $2$ should have been completed.
For a student who made:
$90\%$ on DB $1$
$80\%$ on DB $2$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your midterm grade , the grade in Week $12$ (the twelfth week of the course).
According to the course syllabus:
In the beginning of Week $12$:
(1.) DB $1$ should have been completed.
(2.) DB $2$ should have been completed.
(3.) DB $3$ should have been completed.
(4.) DB $4$ should have been completed.
(5.) Midterm should have been completed.
For a student who made:
$90\%$ on DB $1$
$80\%$ on DB $2$
$85\%$ on DB $3$
$75\%$ on DB $4$
$95\%$ on the Midterm
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your midterm grade , the grade in Week $7$ (the seventh week of the course).
According to the course syllabus:
In the beginning of Week $7$:
(1.) DB $1$ should have been completed.
(2.) DB $2$ should have been completed.
(3.) Midterm should have been completed.
For a student who made:
$90\%$ on DB $1$
$80\%$ on DB $2$
$95\%$ on the Midterm
Let us calculate the current grade and the cumulative grade.
Please be reminded (as stated in your course syllabus and the course announcements) that:
(1.) The final grade is the Weighted Total grade in your Blackboard gradebook.
(2.) The final grade is rounded to the nearest integer only one time
$86.512\% \approx 87\% \:\:\:while\:\:\: 86.499999999\% \approx 86\%$
(3.) Please do not request for extra credit or bonus points. I do not have any.
I do not believe in extra credit or bonus points unless it is part of the school's policy. It is not.
I believe in giving all my students a lot of oppportunities to succeed.
All assessments have been released for you.
The initial due dates are the same as the final due dates for the Module DB assignments.
The initial due dates for all the assessments besides the DB assignments are different from
the final due dates.
Those dates are listed on your course syllabus. Besides the DB assignments, there is no deduction for late work for all the assessments after the initial due dates.
However, please do not procrastinate. Begin your work immediately.
You are definitely welcome to work ahead.
Any work submitted after the final due dates will not be accepted.
Grades will be entered/updated at the end of each week by midnight.
Grades will be updated as you complete the assessments.
(4.) Should you have any questions, please contact me via the school's system.
Thank you.
Discussion Board (DB) Rubric
DB Post (50%)
DB Response (30%)
Requirements (20%)
Novice
$0 - 25$
No post was submitted. and/or
Post is not substantive. and/or
Post is partly substantive but not submitted on time.
Novice
$0 - 15$
No response was submitted and/or Response is not substantive.
Novice
$0 - 10$
Some DB requirements were followed or No DB requirement was followed.
Competent
$25 - 40$
Post is substantive, but not submitted on time. and/or
Post is not substantive, but submitted on time.
Competent
$15 - 24$
Response is not substantive.
Competent
$10 - 16$
Some DB Requirements were followed.
Proficient
$40 - 50$
Post is substantive and submitted on time.
Proficient
$24 - 30$
Response is substantive.
Proficient
$16 - 20$
Some DB requirements were followed or All DB requirements were followed.
Midterm Project Rubric
Project (50%)
Requirements (20%)
Math Part (30%)
Novice
$0 - 25$
Project is not a Piecewise function where each piece/function has an independent variable. and/or
Executable file was not submitted independently. and/or
Executable file was submitted but does not work outside the project folder. and/or
Project was not submitted. and/or
Project was submitted but some files are missing. and/or
Project was submitted but does not work. and/or
Project was not submitted as a zip folder (.zip only)
Novice
$0 - 10$
No requirement was met or Some requirements were met.
Novice
$0 - 15$
Documentation of the Arithmetic method and/or Algebraic method was not submitted. and/or
Documentation of the Arithmetic method and/or Algebraic method was submitted but:
Missing steps in the calculations. and/or
Some errors in the calculations.
Competent
$25 - 40$
Executable file was not submitted independently. and/or
Executable file was submitted but does not work outside the project folder. and/or
Project was not submitted. and/or
Project was submitted but some files are missing. and/or
Project was submitted but does not work. and/or
Project was not submitted as a zip folder (.zip only)
Competent
$10 - 16$
Some requirements were met.
Competent
$15 - 24$
Documentation of the Arithmetic method and Algebraic method was submitted but:
Missing steps in the calculations. and/or
Some errors in the calculations.
Proficient
$40 - 50$
Project is a Piecewise function where each piece/function has an independent variable.
Executable file was works outside the project folder.
Project was submitted as a zip folder (.zip only)
Project has all folders and files.
Project works as expected.
Proficient
$16 - 20$
Some requirements were met or All requirements were met.
Proficient
$24 - 30$
Documentation of the Arithmetic method and Algebraic method was submitted.
No missing step or no major missing steps in the calculations. Most or all work is shown.
No errors or very minor errors.
Please type only numbers (integers and decimals only).
The fields for DB 1 are required.
The other fields are not required.
The olive-colored textboxes are the only textboxes that will accept user input.
To Calculate: the current grade and the cumulative grade
Let us assume that you want to find out your current grade in Week $3$ (third week of the course).
According to the course syllabus:
In the beginning of Week $5$:
(1.) DB $1$ should have been completed.
(2.) DB $2$ should have been completed.
For a student who made:
$90\%$ on DB $1$
$80\%$ on DB $2$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your midterm grade , the grade in Week $7$ (the seventh week of the course).
According to the course syllabus:
In the beginning of Week $12$:
(1.) DB $1$ should have been completed.
(2.) DB $2$ should have been completed.
(3.) DB $3$ should have been completed.
(4.) DB $4$ should have been completed.
(5.) Midterm should have been completed.
For a student who made:
$90\%$ on DB $1$
$80\%$ on DB $2$
$85\%$ on DB $3$
$75\%$ on DB $4$
$95\%$ on the Midterm
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your midterm grade , the grade in Week $7$ (the seventh week of the course).
According to the course syllabus:
In the beginning of Week $7$:
(1.) DB $1$ should have been completed.
(2.) DB $2$ should have been completed.
(3.) Midterm should have been completed.
For a student who made:
$90\%$ on DB $1$
$80\%$ on DB $2$
$95\%$ on the Midterm
Let us calculate the current grade and the cumulative grade.
Please be reminded (as stated in your course syllabus and the course announcements) that:
(1.) The final grade is the Weighted Total grade in your Blackboard gradebook.
(2.) The final grade is rounded to the nearest integer only one time
$86.512\% \approx 87\% \:\:\:while\:\:\: 86.499999999\% \approx 86\%$
(3.) Please do not request for extra credit or bonus points. I do not have any.
I do not believe in extra credit or bonus points unless it is part of the school's policy. It is not.
I believe in giving all my students a lot of oppportunities to succeed.
All assessments have been released for you.
The initial due dates are the same as the final due dates for the Module DB assignments.
The initial due dates for all the assessments besides the DB assignments are different from
the final due dates.
Those dates are listed on your course syllabus. Besides the DB assignments, there is no deduction for late work for all the assessments after the initial due dates.
However, please do not procrastinate. Begin your work immediately.
You are definitely welcome to work ahead.
Any work submitted after the final due dates will not be accepted.
Grades will be entered/updated at the end of each week by midnight.
Grades will be updated as you complete the assessments.
(4.) Should you have any questions, please contact me via the school's system.
Thank you.
Discussion Board (DB) Rubric
DB Post (50%)
DB Response (30%)
Requirements (20%)
Novice
$0 - 25$
No post was submitted. and/or
Post is not substantive. and/or
Post is partly substantive but not submitted on time.
Novice
$0 - 15$
No response was submitted and/or Response is not substantive.
Novice
$0 - 10$
Some DB requirements were followed or No DB requirement was followed.
Competent
$25 - 40$
Post is substantive, but not submitted on time. and/or
Post is not substantive, but submitted on time.
Competent
$15 - 24$
Response is not substantive.
Competent
$10 - 16$
Some DB Requirements were followed.
Proficient
$40 - 50$
Post is substantive and submitted on time.
Proficient
$24 - 30$
Response is substantive.
Proficient
$16 - 20$
Some DB requirements were followed or All DB requirements were followed.
Midterm Project Rubric
Project (50%)
Requirements (20%)
Math Part (30%)
Novice
$0 - 25$
Project is not a Piecewise function where each piece/function has an independent variable. and/or
Executable file was not submitted independently. and/or
Executable file was submitted but does not work outside the project folder. and/or
Project was not submitted. and/or
Project was submitted but some files are missing. and/or
Project was submitted but does not work. and/or
Project was not submitted as a zip folder (.zip only)
Novice
$0 - 10$
No requirement was met or Some requirements were met.
Novice
$0 - 15$
Documentation of the Arithmetic method and/or Algebraic method was not submitted. and/or
Documentation of the Arithmetic method and/or Algebraic method was submitted but:
Missing steps in the calculations. and/or
Some errors in the calculations.
Competent
$25 - 40$
Executable file was not submitted independently. and/or
Executable file was submitted but does not work outside the project folder. and/or
Project was not submitted. and/or
Project was submitted but some files are missing. and/or
Project was submitted but does not work. and/or
Project was not submitted as a zip folder (.zip only)
Competent
$10 - 16$
Some requirements were met.
Competent
$15 - 24$
Documentation of the Arithmetic method and Algebraic method was submitted but:
Missing steps in the calculations. and/or
Some errors in the calculations.
Proficient
$40 - 50$
Project is a Piecewise function where each piece/function has an independent variable.
Executable file was works outside the project folder.
Project was submitted as a zip folder (.zip only)
Project has all folders and files.
Project works as expected.
Proficient
$16 - 20$
Some requirements were met or All requirements were met.
Proficient
$24 - 30$
Documentation of the Arithmetic method and Algebraic method was submitted.
No missing step or no major missing steps in the calculations. Most or all work is shown.
No errors or very minor errors.
Please type only numbers (integers and decimals only).
The fields for DB 1 are required.
The other fields are not required.
The olive-colored textboxes are the only textboxes that will accept user input.
To Calculate: the current grade and the cumulative grade
Example 1
Web Scripting I, ASP.NET Web Programming
Let us assume that you want to find out your current grade in Week 6 (sixth week of the course).
According to the course syllabus:
In the beginning of Week 6:
(1.) DB 1 should have been completed.
(2.) DB 2 should have been completed.
For a student who made:
90% on DB 1
80% on DB 2
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your midterm grade , the grade in Week 12 (the twelfth week of the course).
According to the course syllabus:
In the beginning of Week 12:
(1.) DB 1 should have been completed.
(2.) DB 2 should have been completed.
(3.) Midterm should have been completed.
(4.) DB 3 should have been completed.
(5.) DB 4 should have been completed.
For a student who made:
90% on DB 1
80% on DB 2
85% on DB 3
75% on DB 4
95% on the Midterm
Let us calculate the current grade and the cumulative grade.
Please be reminded (as stated in your course syllabus and the course announcements) that:
(1.) The final grade is the Weighted Total grade in your Blackboard gradebook.
(2.) The final grade is rounded to the nearest integer only one time
$86.512\% \approx 87\% \:\:\:while\:\:\: 86.499999999\% \approx 86\%$
(3.) Please do not request for extra credit or bonus points. I do not have any.
I do not believe in extra credit or bonus points unless it is part of the school's policy. It is not.
I believe in giving all my students a lot of oppportunities to succeed.
All assessments have been released for you.
The initial due dates are the same as the final due dates for the Module DB assignments.
The initial due dates for all the assessments besides the DB assignments are different from
the final due dates.
Those dates are listed on your course syllabus. Besides the DB assignments, there is no deduction for late work for all the assessments after the initial due dates.
However, please do not procrastinate. Begin your work immediately.
You are definitely welcome to work ahead.
Any work submitted after the final due dates will not be accepted.
Grades will be entered/updated at the end of each week by midnight.
Grades will be updated as you complete the assessments.
(4.) Should you have any questions, please contact me via the school's system.
Thank you.
Discussion Board (DB) Rubric
DB Post (50%)
DB Response (30%)
Requirements (20%)
Novice
$0 - 25$
No post was submitted. and/or
Post is not substantive. and/or
Post is partly substantive but not submitted on time.
Novice
$0 - 15$
No response was submitted and/or Response is not substantive.
Novice
$0 - 10$
Some DB requirements were followed or No DB requirement was followed.
Competent
$25 - 40$
Post is substantive, but not submitted on time. and/or
Post is not substantive, but submitted on time.
Competent
$15 - 24$
Response is not substantive.
Competent
$10 - 16$
Some DB Requirements were followed.
Proficient
$40 - 50$
Post is substantive and submitted on time.
Proficient
$24 - 30$
Response is substantive.
Proficient
$16 - 20$
Some DB requirements were followed or All DB requirements were followed.
Midterm Project Rubric
Project (50%)
Requirements (20%)
Math Part (30%)
Novice
$0 - 25$
Project is not a Piecewise function where each piece/function has an independent variable. and/or
The URL of the web application (web address) is not included in the project submission. and/or
The URL of the web application is inaccessible. and/or
Project was not submitted. and/or
Project was submitted but does not work. and/or
Project was not submitted as a zip folder (.zip only)
Novice
$0 - 10$
No requirement was met or Some requirements were met.
Novice
$0 - 15$
Documentation of the Arithmetic method and/or Algebraic method was not submitted. and/or
Documentation of the Arithmetic method and/or Algebraic method was submitted but:
Missing steps in the calculations. and/or
Some errors in the calculations.
Competent
$25 - 40$
The URL of the web application (web address) is not included in the project submission. and/or
The URL of the web application is inaccessible. and/or
Project was not submitted. and/or
Project was submitted but does not work. and/or
Project was not submitted as a zip folder (.zip only)
Competent
$10 - 16$
Some requirements were met.
Competent
$15 - 24$
Documentation of the Arithmetic method and Algebraic method was submitted but:
Missing steps in the calculations. and/or
Some errors in the calculations.
Proficient
$40 - 50$
Project is a Piecewise function where each piece/function has an independent variable.
The URL of the web application (web address) is included in the project submission.
The URL of the web application is accessible.
Project was submitted as a zip folder (.zip only)
Project has all folders and files.
Project works as expected.
Proficient
$16 - 20$
Some requirements were met or All requirements were met.
Proficient
$24 - 30$
Documentation of the Arithmetic method and Algebraic method was submitted.
No missing step or no major missing steps in the calculations. Most or all work is shown.
No errors or very minor errors.
Please type only numbers (integers and decimals only).
The fields for the MML Assignments are required.
The other fields are not required.
The olive-colored textboxes are the only textboxes that will accept user input.
To Calculate: the current grade and the cumulative grade
Example 1: MATH1111
Let us assume that you want to find out your current grade in Week $4$ (fourth week of the course).
According to the course syllabus:
In the beginning of Week $4$:
(1.) The MML assignments on Sections $1.1 - 1.6$ should have been completed.
MML assignments on Sections $1.1 - 1.6$ are: $76 + 62 + 53 + 62 + 60 + 32 = 345$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
For a student who made:
$300$ points on the MML assignments on Sections $1.1 - 1.6$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your current grade in Week $4$ (fourth week of the course).
According to the course syllabus:
In the beginning of Week $4$:
(1.) The MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$ should have been completed.
MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$ are: $28 + 29 + 25 + 17 + 23 + 10 = 132$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
For a student who made:
$120$ points on the MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your current grade in Week $4$ (fourth week of the course).
According to the course syllabus:
In the beginning of Week $4$:
(1.) The MML assignments on Sections $6.1 - 6.6$ should have been completed.
MML assignments on Sections $6.1 - 6.6$ are: $64 + 30 + 61 + 53 + 46 + 54 = 308$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
For a student who made:
$300$ points on the MML assignments on Sections $6.1 - 6.6$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your current grade in Week $8$ (eighth week of the course).
According to the course syllabus:
In the beginning of Week $8$:
(1.) The MML assignments on Sections $1.1 - 1.6$, $2.1 - 2.4$, $3.1 - 3.4$ should have been completed.
MML assignments on Sections $1.1 - 1.6$ are: $76 + 62 + 53 + 62 + 60 + 32 = 345$ points.
MML assignments on Sections $2.1 - 2.4$ are: $56 + 50 + 33 + 31 = 170$ points.
MML assignments on Sections $3.1 - 3.4$ are: $54 + 77 + 42 + 53 = 226$ points.
The sum of the MML assignments that should have been completed is $345 + 170 + 226 = 741$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
(4.) Test $1$ should have been completed.
For a student who made:
$720$ points on the MML assignments on Sections $1.1 - 1.6$, $2.1 - 2.4$, $3.1 - 3.4$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
$85\%$ on Test $1$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your current grade in Week $8$ (eighth week of the course).
According to the course syllabus:
In the beginning of Week $8$:
(1.) The MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$, $3.1 - 3.3$, $4.1 - 4.3$, $5.1$ should have been completed.
MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$ are: $28 + 29 + 25 + 17 + 23 + 10 = 132$ points.
MyStat Lab assignments on Sections $3.1 - 3.3$ are: $31 + 37 + 31 = 99$ points.
MyStat Lab assignments on Sections $4.1 - 4.3$ are: $35 + 33 + 20 = 88$ points.
MyStat Lab assignment on Section $5.1$ is: $25$ points.
The sum of the MyStat Lab assignments that should have been completed is $132 + 99 + 88 + 25 = 344$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
(4.) Test $1$ should have been completed.
For a student who made:
$340$ points on the MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$, $3.1 - 3.3$, $4.1 - 4.3$, $5.1$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
$85\%$ on Test $1$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your current grade in Week $8$ (eighth week of the course).
According to the course syllabus:
In the beginning of Week $8$:
(1.) The MML assignments on Sections $6.1 - 6.6$, $7.1 - 7.5$, $8.1 - 8.2$ should have been completed.
MML assignments on Sections $6.1 - 6.6$ are: $64 + 30 + 61 + 53 + 46 + 54 = 308$ points.
MML assignments on Sections $7.1 - 7.5$ are: $56 + 31 + 35 + 43 + 45 = 210$ points.
MML assignments on Sections $8.1 - 8.2$ are: $29 + 31 = 60$ points.
The sum of the MML assignments that should have been completed is $308 + 210 + 60 = 578$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
(4.) Test $1$ should have been completed.
For a student who made:
$500$ points on the MML assignments on Sections $6.1 - 6.6$, $7.1 - 7.5$, $8.1 - 8.2$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
$85\%$ on DB $1$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your current grade in Week $12$ (twelfth week of the course).
According to the course syllabus:
In the beginning of Week $12$:
(1.) The MML assignments on Sections $1.1 - 1.6$, $2.1 - 2.4$, $3.1 - 3.5$, $4.1 - 4.6$ should have been completed.
MML assignments on Sections $1.1 - 1.6$ are: $76 + 62 + 53 + 62 + 60 + 32 = 345$ points.
MML assignments on Sections $2.1 - 2.4$ are: $56 + 50 + 33 + 31 = 170$ points.
MML assignments on Sections $3.1 - 3.5$ are: $54 + 77 + 42 + 53 + 38 = 264$ points.
MML assignments on Sections $4.1 - 4.6$ are: $50 + 27 + 37 + 61 + 73 + 52 = 300$ points.
The sum of the MML assignments that should have been completed is $345 + 170 + 264 + 300 = 1079$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
(4.) Test $1$ should have been completed.
(5.) Project should have been completed.
(6.) Test $2$ should have been completed.
For a student who made:
$1000$ points on the MML assignments on Sections $1.1 - 1.6$, $2.1 - 2.4$, $3.1 - 3.5$, $4.1 - 4.6$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
$85\%$ on Test $1$
$70\%$ on Project
$82\%$ on Test $2$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your current grade in Week $12$ (twelfth week of the course).
According to the course syllabus:
In the beginning of Week $12$:
(1.) The MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$, $3.1 - 3.3$, $4.1 - 4.3$, $5.1 - 5.2$, $6.1 - 6.2, 6.4, 6.6$, $7.1 - 7.2$ should have been completed.
MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$ are: $28 + 29 + 25 + 17 + 23 + 10 = 132$ points.
MyStat Lab assignments on Sections $3.1 - 3.3$ are: $31 + 37 + 31 = 99$ points.
MyStat Lab assignments on Sections $4.1 - 4.3$ are: $35 + 33 + 20 = 88$ points.
MyStat Lab assignment on Section $5.1 - 5.2$ are: $25 + 33 = 58$ points.
MyStat Lab assignment on $6.1 - 6.2, 6.4, 6.6$ are: $43 + 29 + 19 + 18 = 109$ points.
MyStat Lab assignment on Section $7.1 - 7.2$ are: $33 + 31 = 64$ points.
The sum of the MyStat Lab assignments that should have been completed is $132 + 99 + 88 + 58 + 109 + 64 = 550$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
(4.) Test $1$ should have been completed.
(5.) Project should have been completed.
(6.) Test $2$ should have been completed.
For a student who made:
$340$ points on the MyStat Lab assignments on Sections $1.2, 1.3$, $2.1 - 2.4$, $3.1 - 3.3$, $4.1 - 4.3$, $5.1 - 5.2$, $6.1 - 6.2, 6.4, 6.6$, $7.1 - 7.2$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
$85\%$ on Test $1$
$70\%$ on Project
$82\%$ on Test $2$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your current grade in Week $12$ (twelfth week of the course).
According to the course syllabus:
In the beginning of Week $12$:
(1.) The MML assignments on Sections $6.1 - 6.6$, $7.1 - 7.5$, $8.1 - 8.6$, $9.1 - 9.4$ should have been completed.
MML assignments on Sections $6.1 - 6.6$ are: $64 + 30 + 61 + 53 + 46 + 54 = 308$ points.
MML assignments on Sections $7.1 - 7.5$ are: $56 + 31 + 35 + 43 + 45 = 210$ points.
MML assignments on Sections $8.1 - 8.6$ are: $29 + 31 + 47 + 56 + 31 + 52 = 246$ points.
MML assignments on Sections $9.1 - 9.4$ are: $47 + 26 + 29 + 29 = 131$ points.
The sum of the MML assignments that should have been completed is $308 + 210 + 246 + 131 = 895$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
(4.) Test $1$ should have been completed.
(5.) Test $2$ should have been completed.
(6.) Project should have been completed.
For a student who made:
$825$ points on the MML assignments on Sections $6.1 - 6.6$, $7.1 - 7.5$, $8.1 - 8.6$, $9.1 - 9.4$
$80\%$ on the Syllabus Quiz
$90\%$ on DB $1$
$85\%$ on Test $1$
$82\%$ on Test $2$
Let us calculate the current grade and the cumulative grade.
Please be reminded (as stated in your course syllabus and the course announcements) that:
(1.) The final grade is the Weighted Total grade in your Blackboard gradebook.
(2.) The final grade is rounded to the nearest integer only one time
$86.512\% \approx 87\% \:\:\:while\:\:\: 86.499999999\% \approx 86\%$
(3.) Please do not request for extra credit or bonus points. I do not have any.
I do not believe in extra credit or bonus points unless it is part of the school's policy. It is not.
I believe in giving all my students a lot of oppportunities to succeed.
Hence, all assessments besides DB $2$ and the Final Exam has been released for you.
The initial due dates are the same as the final due dates for the DB $2$ assignment and the Final Exam.
The initial due dates for all the assessments besides the DB $2$ assignment and the Final Exam are different from
the final due dates.
Those dates are listed on your course syllabus. Besides the DB $2$ assignment and the Final Exam, there is no deduction for late work for all the assessments after the initial due dates.
However, please do not procrastinate. Begin your work immediately.
You are definitely welcome to work ahead.
Any work submitted after the final due dates will not be accepted.
Grades will be entered/updated at the end of each week by midnight.
Grades will be updated as you complete the assessments.
(4.) Should you have any questions, please contact me via the school's system.
Thank you.
Example 4: MATH1127
Let us calculate the final grade for the course.
According to the course syllabus:
At the end of the course:
(1.) All MyStat Lab assignments should have been completed.
The sum of all the MyStat Lab assignments is $704$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
(4.) Test $1$ should have been completed.
(5.) Project should have been completed.
(6.) Test $2$ should have been completed.
(7.) Test $3$ should have been completed.
(8.) DB $2$ should have been completed.
(9.) Final Exam should have been completed.
Assume a student made these scores on the assessments.
Please be reminded (as stated in your course syllabus and the course announcements) that:
(1.) The final grade is the Weighted Total grade in your Blackboard gradebook.
(2.) The final grade is rounded to the nearest integer only one time
$86.512\% \approx 87\% \:\:\:while\:\:\: 86.499999999\% \approx 86\%$
(3.) Please do not request for extra credit or bonus points. I do not have any.
I do not believe in extra credit or bonus points unless it is part of the school's policy. It is not.
I believe in giving all my students a lot of oppportunities to succeed.
Hence, all assessments besides DB $2$ and the Final Exam has been released for you.
The initial due dates are the same as the final due dates for the DB $2$ assignment and the Final Exam.
The initial due dates for all the assessments besides the DB $2$ assignment and the Final Exam are different from
the final due dates.
Those dates are listed on your course syllabus. Besides the DB $2$ assignment and the Final Exam, there is no deduction for late work for all the assessments after the initial due dates.
However, please do not procrastinate. Begin your work immediately.
You are definitely welcome to work ahead.
Any work submitted after the final due dates will not be accepted.
Grades will be entered/updated at the end of each week by midnight.
Grades will be updated as you complete the assessments.
(4.) Should you have any questions, please contact me via the school's system.
Thank you.
Example 4: MATH1113
Let us calculate the final grade for the course.
According to the course syllabus:
At the end of the course:
(1.) All MML assignments should have been completed.
The sum of all the MML assignments is $1032$ points.
(2.) Syllabus Quiz should have been completed.
(3.) DB $1$ should have been completed.
(4.) Test $1$ should have been completed.
(5.) Test $2$ should have been completed.
(6.) Project should have been completed.
(7.) Test $3$ should have been completed.
(8.) DB $2$ should have been completed.
(9.) Final Exam should have been completed.
Assume a student made these scores on the assessments.
Please be reminded (as stated in your course syllabus and the course announcements) that:
(1.) The final grade is the Weighted Total grade in your Blackboard gradebook.
(2.) The final grade is rounded to the nearest integer only one time
$86.512\% \approx 87\% \:\:\:while\:\:\: 86.499999999\% \approx 86\%$
(3.) Please do not request for extra credit or bonus points. I do not have any.
I do not believe in extra credit or bonus points unless it is part of the school's policy. It is not.
I believe in giving all my students a lot of oppportunities to succeed.
Hence, all assessments besides DB $2$ and the Final Exam has been released for you.
The initial due dates are the same as the final due dates for the DB $2$ assignment and the Final Exam.
The initial due dates for all the assessments besides the DB $2$ assignment and the Final Exam are different from
the final due dates.
Those dates are listed on your course syllabus. Besides the DB $2$ assignment and the Final Exam, there is no deduction for late work for all the assessments after the initial due dates.
However, please do not procrastinate. Begin your work immediately.
You are definitely welcome to work ahead.
Any work submitted after the final due dates will not be accepted.
Grades will be entered/updated at the end of each week by midnight.
Grades will be updated as you complete the assessments.
(4.) Should you have any questions, please contact me via the school's system.
Please type only numbers (integers and decimals only).
The fields for the MOM Assignments are required.
The other fields are not required.
The olive-colored textboxes are the only textboxes that will accept user input.
To Calculate: the current grade and the cumulative grade
Example 1
Let us assume that you want to find out your current grade in Week $2$ (second week of the course).
According to the course syllabus:
After Week $1$:
(1.) The MOM assignment on Numbers should have been completed.
MOM assignment on Numbers is $60$ points.
The entire MOM assignments are $500$ points.
(2.) DB $1$ should have been completed.
DB $1$ is $100\%$.
These are the assessments that should have been completed after Week $1$ For a student who made:
$45$ points on the MOM assignment on Numbers and
$90\%$ on DB $1$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your midterm grade (grade after Week $4$).
According to the course syllabus:
After Week $4$:
(1.) The MOM assignments on Numbers; Ratios and Rates; Proportions; Percents; Measurements,
Units, and Conversions; and Temperature and Rate Conversions should have been completed.
MOM assignment on Numbers is $60$ points.
MOM assignment on Ratios and Rates is $10$ points.
MOM assignment on Proportions is $11$ points.
MOM assignment on Percents is $64$ points.
MOM assignment on Measurements, Units, and Conversions is $70$ points.
MOM assignment on Temperature and Rate Conversions is $10$ points.
The MOM assignments up until the midterm are worth $225$ points.
The entire MOM assignments are $500$ points.
(2.) DB $1$ should have been completed.
DB $1$ is $100\%$.
(3.) DB $2$ should have been completed.
DB $2$ is $100\%$.
(4.) DB $3$ should have been completed.
DB $3$ is $100\%$.
(5.) DB $4$ should have been completed.
DB $4$ is $100\%$.
(6.) Test $1$ should have been completed.
Test $1$ is $100\%$.
These are the assessments that should have been completed after Week $4$ For a student who made:
$200$ points on the MOM assignments
$90\%$ on DB $1$
$80\%$ on DB $2$
$85\%$ on DB $3$
$70\%$ on DB $4$
$75\%$ on Test $1$
Let us calculate the current grade and the cumulative grade.
Let us assume that you want to find out your midterm grade (grade after Week $4$).
According to the course syllabus:
After Week $4$:
(1.) The MOM assignments on Numbers; Percents; Measurements, Units, and Conversions; and
Apportionment should have been completed.
MOM assignment on Numbers is $60$ points.
MOM assignment on Percents is $64$ points.
MOM assignment on Measurements, Units, and Conversions is $70$ points.
MOM assignment on Apportionment is $42$ points.
The MOM assignments up until the midterm are worth $236$ points.
The entire MOM assignments are $500$ points.
(2.) DB $1$ should have been completed.
DB $1$ is $100\%$.
(3.) DB $2$ should have been completed.
DB $2$ is $100\%$.
(4.) DB $3$ should have been completed.
DB $3$ is $100\%$.
(5.) DB $4$ should have been completed.
DB $4$ is $100\%$.
These are the assessments that should have been completed after Week $4$ For a student who made:
$200$ points on the MOM assignments
$90\%$ on DB $1$
$80\%$ on DB $2$
$85\%$ on DB $3$
$70\%$ on DB $4$
Let us calculate the current grade and the cumulative grade.
Please be reminded (as stated in your course syllabus and the course announcements) that:
(1.) The final grade is the Weighted Total grade in your Blackboard gradebook.
(2.) The final grade is rounded to the nearest integer only one time
$86.512\% \approx 87\% \:\:\:while\:\:\: 86.499999999\% \approx 86\%$
(3.) Please DO NOT request for extra credit or bonus points.
I do not believe in extra credit or bonus points unless it is part of the school's policy.
I believe in giving ALL my students A LOT of oppportunities to succeed.
Hence, all assessments besides the DB assignments has already been released for you.
The final due dates for all those assessments besides the DB assignments is the date listed on your
course syllabus
without any deduction for late work.
Grades will still be entered weekly.
Grades will be updated weekly as you complete the assessments.
(4.) Should you have any questions, please contact me via the school's system.